Home » Blogs » NEWS » Hanging core of oil-immersed transformer

Hanging core of oil-immersed transformer

Views: 0     Author: Site Editor     Publish Time: 2024-01-02      Origin: Site

Inquire

facebook sharing button
twitter sharing button
line sharing button
wechat sharing button
linkedin sharing button
pinterest sharing button
whatsapp sharing button
sharethis sharing button

The hanging core of oil-immersed transformer is an important structure and type of oil-immersed transformer. The hanging core of oil-immersed transformer is an important operation. The hanging core of oil-immersed transformer has a series of operations. What are the main operations and main steps of the lifting core of an oil-immersed transformer? Let’s check with the editor of the oil-immersed transformer manufacturer in detail:

1. The oil-immersed transformer core is a maintenance and repair method to solve the internal faults and hidden dangers of the oil-immersed transformer. Generally, the oil-immersed oil-immersed transformer (also known as the wet-type oil-immersed transformer) fails or fails the iron loss test. Need to lift out the iron core to re-bake, stack, and then re-fit, press, bake, final assembly, test. When lifting the core, directly loosen the bolts of the large cover of the oil-immersed transformer, and lift the core (iron core and winding) together with the large cover.

2. Steps for lifting the core: select the position of the lifting core and drain the oil (place below the large plate); remove the explosion-proof cylinder, oil pillow, and Buchholz relay; remove the bolts of the large cover; use the balance iron to lift the iron core out and place it in the oil pan ; Check that there is no problem inside and reinstall it in time, reinstall the iron core in the fuel tank; sturdy the big cover bolt; install the removed accessories; inject qualified oil; do a full set of pressure tests after 6-10 hours of standstill.

3. It can be judged by taking an oil sample for chromatographic analysis to determine whether a lifting core is needed. The following analysis results require a lifting core: the hydrogen content exceeds 150ppm; the total hydrocarbon content exceeds 150ppm; the acetylene content exceeds 150ppm.

 

1620892949(1)


Post time: Dec-06-2021

Guangdong Shengte Electric Co., Ltd. is located in Danzao Town, Nanhai District, Foshan City.

QUICK LINKS

CONTACT US
Copyright © 2023 Guangdong Shengte Electric Co., Ltd. All Rights Reserved. Supported by leadong.comSitemapPrivacy Policy