Home » Blogs » PROJECTS » Power Distribution Project of Building No. 9, Longhu Huafu Commercial and Residential Community in Wengyuan County

Power Distribution Project of Building No. 9, Longhu Huafu Commercial and Residential Community in Wengyuan County

Views: 0     Author: Site Editor     Publish Time: 2024-01-02      Origin: Site

Inquire

facebook sharing button
twitter sharing button
line sharing button
wechat sharing button
linkedin sharing button
pinterest sharing button
whatsapp sharing button
sharethis sharing button

Project Date: 2021.6.12

Company Name: Guangdong Yongxin Construction Co., Ltd. Jiangmen Branch

Project Name: Power Distribution Project of Building No. 9, Longhu Huafu Commercial and Residential Community in Wengyuan County

Purchased products: SCB11-500/10: 1 set, SCB13-800/10: 1 set, HXGN15 high-voltage cabinet: 6 sets; DC panel: 2 sets, GCK low-voltage cabinet: 7 sets

The basic cabinet frame of Gck low-voltage cabinet is a combined assembly structure of some welded pipes. The structural parts of the cabinet are connected to each other by screws to form a basic frame cabinet, and then connected to the doors, baffles, drawers, mounting brackets, busbars and electrical appliances that need to be added. Components, etc., assembled into a complete switchgear.

For more information about Shengte Electric project, you can check this page:Shaoguan New 800KVA Box Substation Project

cfyjf (7)


Post time: Jan-26-2022

Guangdong Shengte Electric Co., Ltd. is located in Danzao Town, Nanhai District, Foshan City.

QUICK LINKS

CONTACT US
Copyright © 2023 Guangdong Shengte Electric Co., Ltd. All Rights Reserved. Supported by leadong.comSitemapPrivacy Policy