Project Date: 2021.4.13
Company name: Heyuan Zhongdian Electric Co., Ltd.
Project name: shanty towns in the south of the city
Purchased products: SCB10-800/10: 2 units; SCB10-630/10: 1 unit; SCB10-500/10: 2 units; SCB10-250/10: 1 unit

What are the specifications for the installation of dry-type transformers?

Handover test of dry-type transformer installation specification

The test adjustment and body inspection results of the power dry-type transformer and its accessories must comply with the construction specifications.

Defects such as crack damage and enamel damage are strictly prohibited on the surface of high and low pressure porcelain parts.

The installation specification of dry-type transformers should be accurate, the surface of the body should be clean, and the paint should be complete.

The dry-type transformer installation specification should have anti-smashing and anti-collision measures for the high and low voltage purple bushings and epoxy resin castings of the dry-type transformer in place.

The dry-type transformer body should be kept clean, and the paint surface has collision damage. After the dry-type dry-type transformer is in place, protective measures should be taken to prevent iron parts from falling into the coil.

When working under the conditions of the dry-type transformer installation specification, the operator shall not step on the dry-type transformer, and wear a tool belt to prevent the tool material from falling into and damaging the dry-type transformer.

Operating conditions of dry-type transformer installation specifications

The construction drawings and technical data are complete and correct.

The basic construction of the civil engineering has been completed, and the elevation, size, structure and strength of the embedded parts meet the design requirements.

The roof and roof spraying is completed, the roof has no water leakage, and the doors and windows and glass are well installed.

The indoor rough ground work was completed, the site was cleaned up, and the road was smooth.

For more information about Shengte Electric project, you can check this page:China Railway Eryuan Engineering Group Co., Ltd.

cfyjf (9)


Post time: Jan-26-2022

Guangdong Shengte Electric Co., Ltd. is located in Danzao Town, Nanhai District, Foshan City.

QUICK LINKS

CONTACT US
Copyright © 2023 Guangdong Shengte Electric Co., Ltd. All Rights Reserved. Supported by leadong.comSitemapPrivacy Policy