In the last 10 days, we have been trying to catch up with the goods. By the end of this month,we will complete 4 sets European transformers,
4 sets American transformers, 16 sets transformers and two batches of GCK electric cabinets. Every transformer, every cabinet, we also take every
detail seriously, in order to bring the best to our customers. When the transformer is assembled, we send it to thelaboratory for professional
voltage testing. Only the test data to meet the national standards, qualified, we will send the transformer to the customer, absolutely not
ambiguous. After the completion of the test, we will also decide whether to install the fan temperature control shell for the dry transformer according
to the specific requirements of the customer. As for the European transformer, although the appearance looks similar, in fact, the structure and
configuration will be in accordance with customer requirements forthe relevant design. Similarly, delivery to the customer will be arranged only after
the test has passed.Please believe that we will pay attention to details in design, manufacture, test and every link, and try our best to present to
our customers. Here, I briefly introduce our GCK low pressure tank. GCK low voltageextraction switch cabinet is composed of power center cabinet
and motor control center. It is suitable forpower plants, substations, industrial and mining enterprises and other power users as ac 50Hz, the
working voltage is 660V, the maximum working current is 3150A distribution system, as power distribution, motor control and lighting and other
distribution equipment of electric energy conversion, distribution, control.
Post time: Jul-28-2021